|
Projects ...
A3 Tender Frame
12/27/2006 This page covers the machining of the Tender Frame ... Section 4.0 - 4.9 pages 22-28. |
The Tender Frame includes not only frame for the tender but also a few attachments ... Draw Bar and Pocket; Front Step and Brackets; Rear Coupler Pocket; Foot Board and two sizes of pins. I silver soldered thicker material this time ... that gave me a few problems ... get to that later. Additionally did a couple of new things ... drilling/tapping holes for flat head screws and cutting thin grooves for the e-clips. The material used is 360 Brass stock and 260 Brass sheet material (0.04", 1/16" and 3/32"); brass screws except for the flat head screws which are Stainless Steel. The pins were also made from Stainless Steel (I think) rods. I think because I took the rods from a old copy machine. I don't show all the operations as some of them have been shown before or are very basic. Each picture below is a thumbnail so it can be enlarged to get a better view ... back arrow to return.
|
|
Moving on to the Tender Tank! |
||
| Copyright 2004, 2005, 2006, 2007 Pat Hutcheson |